Expert report on metre-gauge flat wagons with cogwheel brake

Customer: PVF Trade, s.r.o., Czech Republic

Project tasks

  • Project management
  • Definition and procurement of input data
  • Review and appraisal of all input documents
  • Preparation of expert report

Our Approach

PROSE was commissioned by the company PVF Trade, s.r.o., to prepare an expert test report (SV report) on the test report of suspension tests of the vehicle “four-axle service – flat wagon 1000mm track with cogwheel brake”.

The report is intended to provide information on the compliance of the brake tests according to the test report “Flat wagon with toothed wheel brake suspension tests” with the provisions of the AB-EBV and their fulfilment.

All documents submitted were checked for completeness and plausibility. The check was carried out against all relevant requirements from the FOT guidelines AB-EBV.

In the event of inconsistencies and/or missing information, these were requested from the client or other project partners. On this basis, a final expert report was prepared and submitted to the client.

Customer benefit

​PROSE’s prompt preparation of the expert report guarantees a smooth and rapid handling of the authorisation procedure. The intensive review of the documents provided ensures that the report meets the highest quality standards and that the vehicle is guaranteed to operate safely. The intensive project supervision by the PROSE expert regarding adjustments and requirements for the documentation with all project partners relieves the customer of this organisational work and ensures rapid and high-quality processing.

 

 

Delivery of four dummy bogies

Project tasks

  • Project management
  • Manufacture

Our Approach

PROSE was commissioned to develop and manufacture four customised dummy bogies for the depot. The main challenge was to design robust bogies suitable for use in the demanding conditions of a workshop environment. These bogies not only need to have a high load capacity but also have to offer flexible adaptability to different vehicle types and maintenance requirements of the depot. The manufacturing process required carefully selecting materials and technologies that ensure long-term durability and resistance to mechanical stresses and environmental influences. In addition, special attention was paid to ergonomics and user-friendliness to ensure the safety of depot employees and increase the efficiency of maintenance processes. The technical specifications were worked out in detail in close cooperation with the customer to ensure that the finished bogies are optimally adapted to the depot’s specific requirements and existing infrastructure.

PROSE tackled this task with a focused approach to quality and functionality. The four dummy-bogies were manufactured under strict quality control and using high-quality materials. Each bogie was carefully designed to meet the specific requirements of the depot, with particular attention paid to durability and ease of maintenance. The noise reduction target of >1dB set at the beginning of the project was successfully achieved with a theoretical analysis.

Customer benefit

​The provision of these four customised dummy-bogies offers the customer considerable advantages. Thanks to the improved reliability and robustness of the bogies, maintenance work can be carried out more efficiently and safely. This leads to a significant reduction in downtime and an increase in operational safety in the depot. The customised bogies, therefore, not only support daily routines but also help to improve the service life and performance of the vehicles maintained in the depot.

 

   

Gearbox investigation on vehicles

Project tasks

  • Project management
  • Create a feasibility study
  • Test proposals based on the preliminary study
  • Evaluation from tests
  • Recommendations

Our Approach

The feasibility study involved testing the sealing proposals recommended by PROSE on two different gearboxes of the vehicle. One gearbox was found to have a minor leakage, while the second gearbox showed similar levels of leakage as before, despite the use of a sealing compound and a regular O-seal. These tests helped to evaluate the effectiveness of the various proposed sealing methods and provided valuable data for the further development of the solutions.

Customer benefit

​Based on the results of the tests, PROSE can now make specific recommendations for further steps. PROSE, therefore, recommends that the next step is to test the X-seal and simultaneously apply two lines of sealant to the motor output shaft. This recommendation is based on the observed performance of the tested seal variants and aims to develop a more robust solution to prevent oil leakage. This strategic approach allows the customer to make targeted adjustments and improvements to resolve the problem in the long term and improve the operational reliability and service life of the gearbox.

 

    

Examination of an updated production process of the SBB bogie revision maintenance site in Basel

Customer: SBB, Switzerland

Project tasks

  • Project and stakeholder management
  • Process analysis and documentation
  • Identification and development of proposed solutions

Our Approach

Thanks to PROSE’s existing expertise in the areas of maintenance facilities, railway production and operations, the PROSE experts were able to quickly drive forward the creation of the production concept in consultation with the responsible site manager. The first step was to record the existing production process on site and define the target process for efficient handling of the production volume (technical inspection, wheelset processing). Any problems arising from the necessary changes to the feed process were analysed by the PROSE experts in consultation with the internal departments and solutions were proposed. Finally, the entire processes, systems and production equipment at the site were documented.

Customer benefit

Thanks to the PROSE experts’ existing knowledge, SBB benefited from rapid implementation of the production concept and focussed, solution-oriented processing of the identified problem areas.

 

Inspection and assessment of carbody, cracks and corrosion

Project tasks

  • Project management
  • Planning of the project
  • Inspections
  • Establishing an assessment report

Our Approach

As part of the project implementation, PROSE AB carried out thorough inspections on all 9 X60A vehicles to ensure their structural integrity. This was carried out with visual inspections of the vehicle frames and bodies to identify visible damage. This meticulous approach made it possible to precisely document every potential weak point, which allowed targeted planning for necessary repair work. Through the comprehensive inspection and documentation, PROSE AB ensured that all vehicles’ safety and quality requirements were met, improving their operational safety and longevity.

Customer benefit

​By providing nine detailed inspection reports, one for each vehicle, the customer benefited from a comprehensive and accurate overview of the condition of their vehicle fleet. The individual reports provide an accurate assessment of each vehicle’s condition and maintenance needs. This structured and detailed documentation enables the customer to make informed decisions about necessary maintenance and repair measures, helps to optimise operational safety and supports effective resource planning. The reporting thus increases transparency and facilitates strategic planning for the long-term maintenance of the vehicle fleet.

 

     

QA of suppliers and production for driver’s desk refurbishment in C20 Metro

Project tasks

  • Quality assurance of sub-suppliers
  • Supervision of prototype phase
  • First class installation
  • Delivery inspections

Our Approach

PROSE have worked closely with the suppliers from an early phase in the development process to ensure a smooth transition from development through prototype to the production ramp-up phase and to ensure stable quality throughout the serial production.

Customer benefit

By improving the supplier delivery early in the project, the customer could benefit from minimizing quality issues just before the start of production. PROSE’s wide range of available services helped the customer in many stages of the project.

 

Optimisation of the bogie removal/installation process in a maintenance shop of the Swiss Federal Railways

Customer: Swiss Federal Railways (SBB) Passenger Division, Switzerland

Project tasks

  • Solution development
  • Solution assessment
  • Project management

Our Approach

PROSE worked with responsible persons within SBB and other external planners to develop a wide range of possible solutions. On the one hand, solutions for the Basel site were developed, which have been technically tested and already take the site’s production capacities into account. On the other hand, the possibility of outsourcing the work to external service providers was examined due to the challenges in Basel. All solutions were examined in detail, including, for example, the transport of the bogies and vehicle relocations.

Customer benefit

SBB received an overview of 17 solution versions, including an opportunity/risk assessment. Some of these were analysed more thoroughly, including an initial profitability calculation, which forms the basis for the decision on how to proceed

Verification of a maintenance shop for a new vehicle type

Customer: Swiss Federal Railways (SBB) Passenger Division, Switzerland

Project tasks

  • Capturing requirements
  • Checking integrability and identifying problems
  • Definition of measures
  • Project management

Our Approach

The existing infrastructure was used to check which maintenance tracks in the SA Basel were generally suitable for the RABe 512. As soon as the vehicle was available, various inspections and clarifications were carried out directly on the vehicle on the relevant tracks, together with the relevant responsible persons for facilities and occupational safety. All components were systematically analysed, and the need for modifying existing systems or additional auxiliaries was recorded.

Customer benefit

Measures were defined and handed over to the customer for implementation, particularly regarding safe access to the train head and the roof. This way, the procurement requirements for modifying the service facility were bundled before the maintenance, ensuring occupational safety and enabling efficient maintenance tasks.

Maintenance plan for a maintenance shop of the Swiss Federal Railways

Customer: Swiss Federal Railways (SBB) Passenger Division, Switzerland

Project tasks

  • Creation of maintenance plan

Our Approach

​PROSE developed the plan in close cooperation with SBB’s responsible persons. The understanding of the maintenance shop in Basel gained from past assignments and experience with other maintenance facilities helped ensure efficient project implementation.

Customer benefit

SBB received a production concept that describes the interaction of the production resources in the context of the business process model to enable an in-depth understanding of the site within SBB. The target group of the production concept includes the management personnel at the site, partner organisations within and outside the site, the management of SBB Passenger Traffic Production and the facility management.

Development of rail operation and technology strategy 2050

Customer: Rhätische Bahn AG, Switzerland

Project tasks

  • Strategy development
  • Analysis and conception
  • Stakeholder management & methodology
  • Project management, incl. Stakeholders, Communication and Change-Management

Our Approach

Due to the technology’s long life cycle and high investment volume, investments in railway technology require a comprehensible focus and demonstrable benefits. In collaboration with the RhB specialists, PROSE developed an operational target picture and operational use cases for the year 2050 based on the identified challenges of daily operations. Based on this target picture, the benefits created by technology and target systems are clearly identified, and the technology strategy can be aligned with the fulfilment of the target picture.

Based on the operational target picture, the ACTUAL system architecture and the known life cycles were recorded with the RhB experts. Based on the information on the current situation, PROSE was able to develop a proposal for the TARGET system architecture, including migration planning and implementation concepts.

With the help of modern methods and targeted workshops, PROSE and RhB achieved the project goal in a very short time and presented the first results to the strategic steering committee.

Customer benefit

RhB benefited from the PROSE experts’ overall system knowledge and technical expertise in railway operations & automation. In combination with the methodical and analytical approach of the PROSE project team, RhB was able to develop and discuss initial approaches for the implementation of the strategy across all areas. This includes, for example, a migration map with the life cycle of systems and vehicles to identify possible migration windows for the systems, the visualisation of the operational target processes with the target degree of automation and possible implementation variants on the RhB route network.

   

Fire Safety Assessment and Consulting

Project tasks

  • Consultancy
  • Development and creation of fire protection concepts
  • Development and creation of evacuation concepts
  • Analyses of fire protection requirements
  • Compilation of required fire protection test reports
  • Communication with authorities, manufacturers and testing laboratories
  • Integration of fire safety systems
  • Preparation of approval documents relevant to fire protection

Our Approach

PROSE analyses the given situation and develops solutions that meet the applicable fire protection requirements. To this end, PROSE advises the customer and identifies various solutions in order to find an efficient way of achieving the required fire protection for railway vehicles in accordance with EN 45545. Our experts calculate the thermal load of the vehicle during the design and propose measures for its reduction.

Customer benefit

The customer benefits from our many years of experience in the field of fire protection for all types of rail vehicles in accordance with EN 45545, including not only advice but also the creation of concepts, the preparation of the necessary fire protection certificates, contact with manufacturers of fire protection-compliant components and communication with approval authorities. The aim is to place fire protection suitable vehicles into service.

Vehicle procurement – Manufacturing Supervision, Quality Control and Factory Tests

Customer: various customer

Project tasks

  • Acceptance of the welded car bodies / bogie frames
  • Paint inspection and acceptance
  • Intermediate acceptance of main electrical components
  • Intermediate acceptance of interior fittings
  • Factory acceptance/customer acceptance

Our Approach

By regular participation in the vehicle acceptance tests and constant coordination with the team of the vehicle manufacturer, PROSE checks the quality of the production. The customer is permanently kept up to date by the acceptance team regarding the progress of the production as well as possible complications or deadline postponements. He immediately receives the results of the production controls and acceptances and can follow up changes, modifications etc.

The dates for the acceptance of components, intermediate assembly stands and vehicles ready for delivery follow the production plan but are also handled operationally and flexibly in order to be able to react to specific occasions. In this way, control of the construction process is always ensured and there is the possibility of intervention in the event of difficulties such as quality slumps, scheduling, supply, or capacity problems.

Customer benefit

With manufacturing supervision, the manufacturer’s quality assurance process is checked and monitored in addition to the product quality, because every vehicle has gone through this process before it is presented for factory acceptance. Continuous construction supervision ensures consistent quality at a high level.

      