Verification of clearance between infrastructure gauge and infrastructure
Customer: Stadtwerke München GmbH (SWM), Germany
Project tasks
- Support of the SWM project management in the technical evaluation of the results of the infrastructure survey
- Interpretation of the results with regard to the requirements resulting from §18 of the BOStrab (German regulation on the construction and operation of tramways)
- Recommendation of the measures to be taken
- Preparation of the final report of the initial survey for the individual metro lines for submission to the technical supervisory authority
Our Approach
With laser surveying, the existing installations are recorded with a precision that was previously impossible. PROSE supports the SWM project management in the technical evaluation of the results of the infrastructure survey. This includes the interpretation about the requirements resulting from §18 of the BOStrab as well as the measures to be taken. In addition, PROSE prepares the final report of the initial survey for the individual metro lines for submission to the technical supervisory authority.
Customer benefit
PROSE has experts with many years of expertise regarding the interaction of infrastructure and vehicle and especially regarding the clearance of the light area. This enables PROSE to advise clients on the interpretation of the applicable guidelines in case of ambiguous facts. PROSE was able to prove to SWM that several objects, which were initially classified as violating the clearance, do not pose a threat regarding the clearance. Thus, the customer could avoid a cost-intensive dismantling of these objects.