Skip to main content

Tag: Strategy support

Strategy support – Our solutions

Harmonization of modular freight wagon concepts

Customer: BASF/WASCOSA (Germany), DB Cargo/VTG (Germany), RCA (Austria), SBB Cargo (Switzerland)

Project tasks

1st phase:

  • Neutral collection, analysis and evaluation
  • Comparison and evaluation

2nd phase:

  • Creation of a common experimental description

3rd phase:

  • Evaluation of the safety techniques
  • Recommendation for a future standard

4th phase:

  • Cluster development
  • Force application point

Our Approach

The technical innovation group for rail freight (TIS) sees the modular design of carrying wagons in conjunction with innovative container concepts as an approach to solving the problem outlined. Innovative container solutions are also becoming increasingly popular for bulk goods.

Customer benefit

The securing techniques developed in the various concepts of modular construction and container concepts were evaluated with regard to their effect on the forces and accelerations measured in the sequence tests. Furthermore, a recommendation for a possible future standard for a securing system, possibly for different classes of accelerations and forces, was developed. PROSE developed different clusters for the classification of transport goods/containers.

 

Conceptualisation of a meter gauge vehicle platform

Customer: Matterhorn-Gotthard Bahn, Rhätische Bahn AG, zb Zentralbahn AG, Switzerland

Project tasks

  • Screening of inventory documentation
  • Development of an evaluation matrix
  • Realization of workshops
  • Evaluation of the requirements
  • Development of a vehicle concept

Our Approach

PROSE analyzed the existing documentation of the MGB, the RhB and the zb and compared them in a jointly defined depth and structure to be developed together. Further PROSE captured the vision of the future of the three operators in the four topics: 1. market, 2. operation and production, 3. technology and 4. infrastructure, as well as the classification for each topic.

Customer benefit

The joint achievement of the objectives of the “analysis” phase represents an important milestone for the project partners (MGB, RhB, zb) in defining the strategic direction of the next project phase, in which the upcoming vehicle procurement by means of a call for tenders in accordance with BöB/VöV is located.

 

© PROSE. All rights reserved