Developing and authorising new personnel and workshop vehicles
Customer: Gföllner Fahrzeugbau und Containertechnik GmbH, Austria
Project tasks
- Mechanical engineering in the concept phase
- Electrical engineering in the concept phase
- Fire safety (including expert report on fire safety)
- Workers safety assessment
- Overall risk analysis
- Vehicle authorisation
Our approach
Gföllner developed and delivered new Personnel and Workshop Vehicles (PWFZ) for railway construction and maintenance activities. The vehicles combine a carrier wagon specially developed by Tatravagonka for the PWFZ, including bogies, with an equipped user-oriented container (AOC) comprising a lounge area, kitchen, workshop, and storage space for machinery and materials. An emission-free battery system supplies power to the installed electrical infrastructure.
The vehicles are designed both for use directly on construction sites and for transporting personnel to and from work locations. Their development required the integration of mechanical, electrical, structural, fire safety and occupational health requirements into a compliant overall vehicle concept.
PROSE supported Gföllner throughout the concept phase and authorisation process, taking into account both end-customer expectations and the requirements of the Swiss Federal Office of Transport (FOT).
PROSE supported Gföllner throughout the approximately two-year vehicle development process with interdisciplinary railway engineering and approval expertise. Our specialists provided support in mechanical engineering, electrical engineering, structural calculations, fire protection, occupational safety, and vehicle approval.
PROSE also conducted the risk assessment for the entire vehicle. Technical aspects were always considered in the context of the overall vehicle and its approval, from the mechanical design during the concept phase to the electrical grounding of the container and its components.
Thanks to our expertise in Swiss railway regulations and FOT requirements, regulatory and other stakeholder requirements could be incorporated into the development process at an early stage.
Customer benefit
Gföllner delivered the vehicles on time and achieved a first-time-right outcome. PROSE contributed to this result by combining multidisciplinary railway engineering with detailed knowledge of Swiss authorisation requirements, allowing technical, regulatory and stakeholder requirements to be addressed together throughout development.
The operating permission for commercial use was issued only around 2.5 weeks after the first equipped user-oriented container (AOC) was installed on the base wagon and the complete vehicle became available for verification and testing. This short timeframe was supported by addressing stakeholder requirements early and coordinating activities on the critical path efficiently in close collaboration with Gföllner.
As an independent engineering partner, PROSE provided the required specialist expertise through a single point of contact.